Confidence IndexWoWNaN%MoMNaN%(13/10/2025)

花園城 三期

Shatinpark Stage 3

FullStarFullStarFullStarFullStarBlankStar
4.0
Estate Rating
location
13-15 Kong Pui Street, Shatin Town Centre
Contract Date:
Video
Photo
Floor Plan
Site Plan
Map
1/2

花園城 三期

Shatinpark Stage 3

FullStarFullStarFullStarFullStarBlankStar
4.0
Estate Rating
location
13-15 Kong Pui Street, Shatin Town Centre
Contract Date:
Avg. Trans. Price/ft² (Last 30 Days)
$11,218
MoM
0.3%
Trans. Volume (Last 30 days)
1 Case(s)
Avg. Listing Price/ft²
$12,360
Price by Listing
-
Avg. Trans. Rent/ft² (Last 30 Days)
-
   
 
Avg. Listing Rent/ft²
$47
Rent by Listing
-

Shatinpark Stage 3Information

Shatinpark Stage 3 is located at 13-15 Kong Pui Street, Shatin Town Centre, New Territories. The developer is CHINACHEM, the Occupation date starts from January 1985. It consists of 3 buildings with a total of 416 residential units, designed from 2 bedrooms. There are Swimming Pool, Kids' Facilities, Catering Facilities in Shatinpark Stage 3. There is good public transport, about 6 mins walking distance to MTR. Nearby are Chuen Fai Centre Car Park; with a 9 minute walk to the Sha Kok Shopping Centre, and 3 minutes to the Sha Tin Road Safety Park. The area also features Tesla Charging Station and Sha Tin Wai Pet Clinic. POA School Net is 91. Secondary school district is in Shatin.
No. of Block(s)
3 Blocks
No. of Units
416 Units
Building Age
40.8 Yrs
Date of Occupation Permit
04/01/1985
Facilities
Swimming Pool
Kids' Facilities
Catering Facilities
Nearby primary school: Baptist Lui Ming Choi Primary School, Baptist (Sha Tin Wai) Lui Ming Choi Primary School, Stewards Pooi Kei Primary School, The Evangelical Lutheran Church Of Hong Kong Wo Che Lutheran School, Twghs Tsoi Wing Sing Primary School, Po Leung Kuk Siu Hon-Sum Primary School
Nearby secondary school: Shatin Tsung Tsin Secondary School, Sheng Kung Hui Tsang Shiu Tim Secondary School, Sheng Kung Hui Lam Kau Mow Secondary School, Baptist Lui Ming Choi Secondary School, Kiangsu-Chekiang College (Shatin), Pui Kiu College
No. of Storeys
17 Storeys (Block A-B) * Not Including Level 1-3 11 Storeys (Block C) * Not Including Level 1-3
Developer
CHINACHEM
Vendor / Holding company of the Vendor
Vendor Chinachem Realty Limited
Management Co.
Hop On Management Company Limited
Term of Year
99 Years Commencing From 1 July,1898

Shatinpark Stage 3Surrounding Amenities

MTR Station
6
mins
Sha Tin Wai Station
Shopping Mall
9
mins
Sha Kok Shopping Centre
Car Park
1
min
Chuen Fai Centre Car Park
Recreations and Cultural
3
mins
Sha Tin Road Safety Park
Hospital
7
mins
Pamela Youde Child Assessment Centre (Shatin)

Shatinpark Stage 3Transactions

More Transactions
All Layout
Contract / Reg. Date
Address
Layout
Price
Area(SFA)
Price/ft²(SFA)
Last Reg.Price/ Change
Holding Period
^ Special transactions
Sell Online