Confidence IndexWoWNaN%MoMNaN%(07/10/2025)

壹號雲頂 3期 (頂峰別墅)

Peak One Phase 3 (Peak House)

FullStarFullStarFullStarFullStarBlankStar
4.0
Estate Rating
location
68 Mei Tin Road, Tai Wai Mid-Levels
Contract Date:
Video
Photo
Floor Plan
Site Plan
Map

壹號雲頂 3期 (頂峰別墅)

Peak One Phase 3 (Peak House)

FullStarFullStarFullStarFullStarBlankStar
4.0
Estate Rating
location
68 Mei Tin Road, Tai Wai Mid-Levels
Contract Date:
Avg. Trans. Price/ft² (Last 30 Days)
$27,440
MoM
-
Trans. Volume (Last 30 days)
-
Avg. Listing Price/ft²
$27,152
Price by Listing
-
Avg. Trans. Rent/ft² (Last 30 Days)
-
   
 
Avg. Listing Rent/ft²
-
Rent by Listing
-

Peak One Phase 3 (Peak House)Information

Peak One Phase 3 (Peak House) is located at 68 Mei Tin Road, Tai Wai Mid-Levels, New Territories. The developer is SUN HUNG KAI, the Occupation date starts from August 2009. It consists of 13 Houses with a total of 13 residential units, designed from 3 bedrooms to 4 bedrooms, with salesable area from 2,532 to 3,240 sq.ft.. There are Clubhouse, Swimming Pool in Peak One Phase 3 (Peak House). POA School Net is 88. Secondary school district is in Shatin.
No. of Block(s)
13 Blocks
No. of Units
13 Units
Building Age
16.1 Yrs
Date of Occupation Permit
27/08/2009
Facilities
Clubhouse
Swimming Pool
Estate
Feature
Pet Allowed
House
Nearby primary school: Sha Tin Government Primary School, Christian Alliance H.C. Chan Primary School Of The Kowloon Tong Church Of The Chinese Christian And Missionary Alliance, Hong Kong, Immaculate Heart Of Mary School, Tung Wah Group Of Hospitals Sin Chu Wan Primary School, Carmel Alison Lam Primary School, Po Leung Kuk Dr. Jimmy Wong Chi-Ho (Tin Sum Valley) Primary School
Nearby secondary school: Shatin Tsung Tsin Secondary School, Sheng Kung Hui Tsang Shiu Tim Secondary School, Sheng Kung Hui Lam Kau Mow Secondary School, Baptist Lui Ming Choi Secondary School, Kiangsu-Chekiang College (Shatin), Pui Kiu College
No. of Carparks
4 Motor Cycle Parking Spaces 4 Bicycle Parking Spaces 18 Visitor Car Parking Spaces (Including 1 Disabled Person's Car Parking Space) 3 Loading & Unloading Spaces
No. of Storeys
3
Developer
SUN HUNG KAI
Vendor / Holding company of the Vendor
Vendor Beachshore Limited And Tsuen Kwong Limited (Parent/Holding Company Of The Vendor: Sun Hung Kai Properties Limited)
Management Co.
Royal Elite Service Company Limited

Peak One Phase 3 (Peak House)Transactions

More Transactions
All Layout
Contract / Reg. Date
Address
Layout
Price
Area(SFA)
Price/ft²(SFA)
Last Reg.Price/ Change
Holding Period
^ Special transactions
Sell Online